The Federal Controller of Works, Lagos State, Mr Olukayode Popoola, on Sunday, said that the total shutdown of the Third Mainland Bridge would be lifted at midnight of today, January 31. This is 24 hours ahead of scheduled reopening date, hence the bridge was today, reopened by midnight.
Popoola said the Contractor was able to complete the repair works on the bridge on Saturday, hence the lifting of the total closure at midnight today.
Read more details at punch
Got gist? SMS:08029976464 WhatsApp:08029976464 Email:inkubwa@gmail.com

No comments:
Post a Comment